Home / Technologies / TruckinGo

TruckinGo

A marketplace built in phases.

TruckinGo matches shippers and carriers on a map. One account can switch between posting a load and carrying one. The build is a numbered sequence: each phase has a written reason to come before the next. Phases 1 through 8 closed on 26 October 2026, and the dense block of work runs from that day: sixteen phases, a money layer, and a matching engine, with the gates that hold them written alongside.

The stack the phases sit on

Laravel 12 and PHP 8.3, PostgreSQL 16, Redis 7, Sanctum for tokens, Horizon for queues. The interface is Vue 3, TypeScript, Vite, Pinia, and PrimeVue. The map is Leaflet. Native shells are Capacitor 8. The whole local stack runs under Docker Compose, with a Windows setup pass on 23 July 2026. The same day a structured technical report was added, and environment files were taken out of git. Through late October the queue runner was upgraded so its workers survived the framework upgrade, packages flagged by the dependency audit were patched, and a real-browser layer was added over the other two test layers, because it reaches what neither of them can.

Phase 1 · June 2026 · done

Proof before the job may move

A job cannot change state without pickup proof and delivery proof. Upload is three steps: a presigned request, the file, then finalize. The status endpoint returns the proof id. Driver mode uses that component; duplicate state buttons were removed so the proof step is the path, not a parallel one.

Phase 2 · June 2026 · done

Both languages, before more screens

Turkish and English cover authentication, forms, enums, map popups, and API messages. Offer and job state labels are translated rather than shown as stored codes. Locale loading merges with the component library’s own strings. New screens were held until this layer existed, because every later feature would have added another hardcoded string.

Phase 3 · June 2026 · done

The map is the first screen

Filters and nearby results were filled in, then checked with a Docker and interface smoke pass. The carrier map can show route distance. The viewport is kept when the person moves to another page and back, so the map does not reset under them. Nearby loading was stabilized in the same stretch.

Phase 4 · June 2026 · in the code

The device, while a job is active

Capacitor 8 project shells and a permission onboarding flow were added. Background location starts from the driver job view during active states. The web build no-ops that call, so the browser does not pretend to be a phone. Native store testing was still listed as pending when the phase was marked in code.

Phase 5 · June 2026 · done in code

Push that can be absent

Device tokens and a preferred locale target the notification. Offer and job events dispatch a localized push through a queue. If Firebase credentials are missing, the send is skipped. The job itself does not fail because a notification could not leave.

Phase 6 · June 2026 · done

Chat only for the people on the job

Messages are scoped to the job and to its participants. The panel polls. A rate limit and explicit error handling were added after the first path, and the same panel is embedded in both the shipper and the carrier job views.

Phases 7 and 8 · 26 Oct 2026 · done

The admin panel, rating, and dispute landed together

Phase 7 and phase 8 closed on the same day. Carrier verification became an admin decision rather than something onboarding granted automatically. Rating, objection, and admin resolution went in. Offer negotiation and the gaps in the load lifecycle were closed behind them. Every map moved behind one BaseMap component and the list and the pins were put in sync. The same day the project got the things that would hold it: a verification gate script, a control catalogue, and a written rule file.

Phases A–E · 27–28 Oct 2026

Scoring that watches before it decides

Proof metadata was collected and scored in observation mode, so the score existed before it was allowed to matter. Raw location is kept for 24 hours and then survives only as an anonymous aggregate, behind a queue, a quota, and a circuit breaker. Matching got an H3 prefilter and a direction signal. Road distance went in with an honest fallback rather than a silent one. The trace is snapped to the road before the raw points are deleted, and carbon is reported with its provenance attached. The empty-kilometre baseline was written under its own name while it still could not measure anything.

Phases 9 and 10 · 29 Oct – 1 Nov 2026

Live tracking, and a regression suite on a real database

Live tracking and notification went in, and the regression suite was put on a real PostgreSQL rather than a substitute. What a response may contain became a whitelist instead of whatever the model happened to hold. A photo URL is signed relative to the application, not to the request Host. Password reset worked and account enumeration was closed with it. A notification started saying which load it was about. Deadlines were enforced at the moment of the action rather than by a sweeper that ran later.

Phases 11 and 12 · 1–2 Nov 2026

The money layer, with a ledger that balances

Escrow, a double-entry ledger, and commission went in on the same day as carrier payouts. An IBAN is verified before it is stored. Matching quality and its management came in alongside. This was the largest single day of the build: 242 files changed. The distance code was cleaned up at the same time, because the money had started depending on it — every distance was named for where it came from, and one haversine was kept instead of several.

Phases 13–15 · 2–4 Nov 2026

The matcher came on screen, and its inputs were kept

The matching engine reached the screen and the shipper’s side was scored too. The signals the matcher saw were recorded, so weights could be learned later rather than guessed now. An invite flow let a shipper ask a named carrier and see the answer. Notifications started going to the load rather than to a list. The sweepers were put through the state machine, which is when escrow actually began releasing. Phase 15 added a conversation channel before the job exists, bound to the pair that already has traffic between them.

Phase 16 · 17–19 Nov 2026

An administrator acts on a person, and says why

Suspension carries its reason, and the reason reaches the person it is about. There is one screen per person, and the panel is not a seat for handling money. A person can correct their own name and telephone number. Changing an email address proves the new address before it is accepted, and a preflight check asks whether the post can actually leave. Account deletion is anonymisation, which the schema had already said before the feature was written. Behind three green gates, one pass through the product in a browser found five more defects.

Product tours · 20–26 Nov 2026

Walking the product, and writing down what lied

The last week was not new features. It was tours through the running product with the defects written into a catalogue as numbered entries, and the rule behind each one written into the rule file. Across three months this produced 199 fix commits against 53 feature commits — roughly four corrections per feature, which is the measurement of a working method rather than a sign of trouble. The honest part belongs here too: in one tour five of the measurement tools themselves turned out to be lying, and that was recorded rather than quietly corrected. One language gate went from 48 minutes to 1.9 seconds once it was asked to compare the dictionaries against the product instead of against each other.

Gates · last full run 25 Nov 2026

What has to pass before anything ships

One script runs PHP syntax, Vue type checking, end-to-end types, translation parity, colour tokens, the backend suite, the production build, and an API health check: 33 passing, 0 failing, 1 skipped. Behind it are 1,100 backend tests, 1,152 frontend tests with no framework warnings, 376 API behaviour checks covering permission boundaries, the state machine, and money, and 227 real-browser checks. Two items are open and written down rather than closed: a payment row three pixels over the product’s own density limit at 1366 px, and an escrow queue that draws the age of a decided row but not of a waiting one.